Skip to Content

Solar Photovoltaic Power Plant "Arhar 1"

Solar photovoltaic power plant "Arhar 1" with an output active power of 990 kW with an associated substation of production 0.4/10(20) kV/kV with a power of 1250 kVA, with a 10(20) kV cable connection line and with an optical multimode line.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Novo Miloševo - municipality:  Novi Bečej                                                              


Solar Photovoltaic Power Plant 

Solar photovoltaic power plant with a planned approved power of 990 kW with an associated substation of production TS1 0.4/10(20) kV/kV, with a 10(20) kV cable connection line and with a fiber optic cable.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Gornja Trešnjevica - municipality:  Arandjelovac                                                            


Solar Photovoltaic Power Plant "Arhar ŽI 1"

Solar photovoltaic power plant with associated production substations, with 20 kV cable connection line and optical cable line.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Begejci - municipality:  Žitište                                                            


Solar Photovoltaic Power Plant "Solar lux"

Solar photovoltaic power plant with associated production substations.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Stropsko - municipality:  Vranje                                                           


Solar Photovoltaic Power Plant "EUROSOLAR"

Solar photovoltaic power plant with a planned approved power of 2400 kW with an associated production substation, with a 20 kV cable connection line and with a fiber optic cable

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Sutjeska - municipality:  Sečanj                                                           


Solar Photovoltaic Power Plant "Mužlja"

Solar Photovoltaic Power Plant with maximum output active power of 9799 kW with associated substations of production TS1 - TS8.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Mužlja - municipality:  Zrenjanin                                                           


Solar Photovoltaic Power Plant "Arhar KO 1"

Solar photovoltaic power plant with associated production substations, with 20 kV cable connection line and fiber optic cable.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Kovin - municipality:  Kovin                                                           


Solar Photovoltaic Power Plant "Arhar Senta"

Solar photovoltaic power plant with associated production substations, with 20 kV cable connection line and fiber optic cable.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Senta - municipality:  Senta                                                           


Solar Photovoltaic Power Plant "Solar Energy Odžaci"

Solar photovoltaic power plant "Solar Energy Odžaci" with associated production substations, 20 kV cable connection line and optical multimode line.

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Odžaci - municipality:  Odžaci                                                           


Solar Photovoltaic Power Plant "M&C Bretsač"

Solar photovoltaic power plant with associated production substations, with outdoor lighting poles, with 20 kV cable connection line and with optical multimode line

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Brestač - municipality:  Pećinci                                                           


Solar Photovoltaic Power Plant "B2 Sunspot 2"

Solar photovoltaic power plant with associated facilities (production substations and RP facility)

Work on leveling the plot, installing and leveling internal roads, connecting to the existing traffic infrastructure, and preparing all documentation related to traffic infrastructure.

Mokrin - municipality:  Mokrin                                                           


An address must be specified for a map to be embedded